Limei Dog Leash 66FT Long Lead Nylon Leash with Swivel Lockable Hook and Comfortable Padded Handle Walking Hunting Camping Yard for Small Medium Large Dogs (Green)
We may earn a commission. Price and availability can change after publication.
Report incorrect price or availabilityPrice history
Recorded from verified retailer catalog checks. Price and availability can still change at checkout.
Claim the offer with confidence
Confirm the selected product and final price at the retailer before completing checkout.
One quick check
- Open the deal page at Walmart and confirm the listed variation/size.
Price summary
| Current price | $14.28 |
|---|---|
| Original price | |
| You save | $3.14 (18%) |
What makes this deal worth a look
- Specifications
This is dog training rope pet dog leashes. It is can be used puppy dog lead belt when walking running jogging sports etc. Durable and useful dog products. Type: Pet Leash Material: Imitation Nylon + Titanium Alloy Fit for: Small and Medium Size Pets Features: Candy Color Durable Dog Harness Pet Accessories Length: 3 Meters 6 Meters 10 Meters 15 Meters 20 Meters Width: 2cm/0.79 (Approx.) Notes: Due to the light and…
Explore More Savings Topics
Keep browsing verified offers selected for value and relevance.
- Country Brook Petz® Nature Walk Martingale Dog Collar 2XS$14.50
- Aquaneat Aquarium 1 Bio Balls Fish Tank Canister Filter Media 100pcs$13.99
- Cute Husky Dog Cartoon T-Shirt Infant -Image by Shutterstock 6 Months$13.99
- Gonzo 1020D Pet Hair Lifter Sponge$14.64
- Women s Lost Gods Cat Astronaut in Space Racerback Tank Top Black Heather Large$14.99
- Womens Dont Hurry Be Happy T Shirt Funny Zen Sloth Meditate Graphic Novelty Tee for Ladies Womens Graphic Tees$14.99








